Cloud Migration Services for AWS, Azure and Google Cloud

System healthAll checks passing
Discovery and dependency mapping
Migration planning and wave design
Landing zone setup
Server and application migration
$ deploy --env production
✓ build · tests · security scan
✓ released with zero downtime

The hard part happens later, when someone has to work out which of dozens of interdependent applications go first, how to move a busy database without losing a single transaction and how to switch over without customers noticing. Migrations that go wrong tend to fail for predictable reasons: unknown dependencies, rushed cutovers, untested rollback plans and a lift-and-shift that brings every old problem along with it.

Baniwal Infotech delivers cloud migration services that move applications, databases, servers and websites to AWS, Microsoft Azure or Google Cloud, or between them, with a clear plan and minimal disruption. We discover what you have, choose the right migration path for each workload, move it in carefully sequenced waves, test thoroughly and hand over a well-run environment. Where it makes sense, we modernize during the move so you start benefiting from the cloud on day one.

Process

When cloud migration is the right next step

If you are still deciding whether or why to move, start with cloud consulting, which covers strategy, provider choice and architecture. Migration is the execution stage. It is the right next step when:

  • A data center contract, hardware refresh or hosting renewal is approaching.
  • On-premise or legacy hosting limits your ability to scale, release or recover from failure.
  • You are consolidating after an acquisition or moving between cloud providers.
  • Customers, auditors or regulators expect capabilities that are easier to achieve in the cloud.
  • The workloads in scope and the target platform have been agreed.
Compare

Choosing a migration strategy for each workload

Not every application should be moved the same way. We assess each one and choose from established migration strategies, often called the "Rs."

StrategyWhat it meansBest forTrade-off
Rehost ("lift and shift")Move servers or VMs largely as they areTight deadlines, stable apps, data center exitsFast, but few cloud benefits until optimized later
Replatform ("lift and reshape")Move with targeted changes, such as a managed database or containersApps that benefit from managed services without rewritesModerate effort for meaningful gains
Refactor or re-architectRedesign to use cloud-native servicesStrategic apps that need scale, speed or resilienceHighest benefit, highest effort and time
RepurchaseReplace with a SaaS productCommodity functions such as email, CRM or HRFast, but requires data migration and process change
RelocateMove a virtualized environment to a cloud-hosted equivalent with minimal changeLarge VMware estates needing a quick moveQuick, with continued reliance on existing platform skills
Retain or retireKeep on-premise for now, or switch offApps with constraints, or ones nobody usesReduces scope and cost of the migration

A typical portfolio mixes several strategies. Retiring unused applications alone often shrinks the scope noticeably.

What we do

Our cloud migration services

01

Discovery and dependency mapping

We inventory servers, applications, databases, integrations and network flows using discovery tools and interviews, then map dependencies so tightly connected systems move together. This step prevents most migration surprises.

02

Migration planning and wave design

We group workloads into waves by dependency, risk and business priority, starting with lower-risk systems to prove the approach. Each wave has a runbook, cutover plan, rollback plan and success criteria.

03

Landing zone setup

Before workloads arrive, we build or validate the target foundation: accounts or subscriptions, identity, networking, connectivity back to your offices or data center, security baselines and logging, all defined as code where possible.

04

Server and application migration

We migrate virtual and physical servers using provider tools for block-level replication, then test in the cloud before cutover. For web applications, we move code, configuration, files and scheduled jobs and update DNS with low TTLs for quick switchover.

05

Database and data migration

We move databases with minimal downtime using replication and change data capture where possible, so the source and target stay in sync until cutover. We also handle schema conversion between engines, for example moving from a commercial database to a managed open-source one, and validate data integrity after the move.

06

Cloud-to-cloud migration

Moving between AWS, Azure and Google Cloud involves mapping equivalent services, replacing provider-specific features, migrating data and rebuilding infrastructure as code for the new platform. We plan these moves to avoid paying for two environments longer than necessary.

07

Website and e-commerce hosting migration

Moving a busy website or store from shared, VPS or on-premise hosting to cloud hosting with a CDN, managed database and autoscaling, with SEO and uptime protected throughout.

08

Post-migration optimization

After workloads are stable, we rightsize resources, apply commitment discounts, set up monitoring and backups and identify modernization opportunities for the next phase.

Process

Our migration process

01

Assess

Discovery, dependency mapping, performance baselines and a total cost comparison between your current hosting and the target cloud.

02

Plan

Migration strategy per workload, wave plan, runbooks, risk register, testing approach and communication plan.

03

Prepare

Landing zone, connectivity, security controls, migration tooling and a pilot migration of a low-risk workload.

04

Migrate

Wave-by-wave replication, testing and cutover during agreed windows, with rollback ready at every step.

05

Validate

Functional, performance and security testing, data reconciliation and business sign-off for each wave.

06

Optimize and hand over

Cost and performance tuning, documentation, monitoring and handover to your team or to our ongoing support.

Avoiding downtime and data loss

The cutover is where migrations are won or lost. Our standard safeguards include:

Rehearsed cutovers

We run at least one full practice migration in a non-production environment.

Continuous replication

For servers and databases, so the final switchover window is short.

Defined rollback criteria

Agreed in advance, so the decision to roll back is objective, not panicked.

Data validation

With row counts, checksums and application-level checks before and after cutover.

Low DNS TTLs

Set well before cutover, so traffic shifts quickly.

Freeze windows

Agreed with business teams, avoiding peak sales periods and month-end.

Hypercare

Heightened monitoring and on-call support for the days after each wave.

Insight

Common migration mistakes we help you avoid

Moving everything as-is

And then being surprised that the cloud bill is higher than the data center.

Ignoring licensing

Some software licenses change cost or terms when moved to the cloud.

Underestimating data transfer time

For large databases and file stores.

Forgetting hidden dependencies

Such as hard-coded IP addresses, scheduled jobs, file shares and email relays.

Skipping performance baselines,

Which makes it impossible to prove the new environment is as fast as the old one.

Leaving security for later,

Instead of building it into the landing zone from the start.

Example scenario for illustration

Example: moving a legacy order platform from on-premise to the cloud

A distribution company runs its order management system, customer portal and reporting database on aging on-premise servers whose support contract is ending. Discovery reveals an undocumented nightly job that exports orders to the warehouse system over a file share. We plan three waves: reporting first, then the customer portal, then the order system and its database. The database moves to a managed service using continuous replication, the file-share job is replaced with secure cloud storage and an event trigger, and the portal is containerized during the move. After a rehearsal weekend, the final cutover happens overnight with a tested rollback plan, followed by two weeks of hypercare.

Proof slota real migration with scope, downtime achieved, cost or performance outcomes, and a client quote
Compare

How to choose a cloud migration partner

  • Ask how they discover and map dependencies before planning waves.
  • Request a sample runbook and rollback plan.
  • Check experience with your source environment and target cloud.
  • Confirm how they handle database migration and data validation.
  • Ask what happens after cutover: hypercare, optimization and support.
  • Make sure all accounts are created in your name and all infrastructure code is yours.
Technology

Tools and platforms we use

AWS Application Migration Service, AWS Database Migration Service and AWS DataSync; Azure Migrate and Azure Database Migration Service; Google Cloud Migration Center, Migrate to Virtual Machines and Database Migration Service; Terraform, OpenTofu and native infrastructure-as-code tools; Docker and Kubernetes for containerization; and provider monitoring tools alongside Datadog, Grafana and similar platforms.

Why Baniwal

Why choose Baniwal Infotech for cloud migration

01Multi-cloud capability

Across AWS, Azure and Google Cloud, including cloud-to-cloud moves.

02Application expertise

Our developers understand the software being moved, not just the servers.

03Low-risk delivery

With rehearsed cutovers, rollback plans and weekly progress demos.

04Modernize where it pays,

Without turning a migration into an endless rewrite.

05Transparent, fixed quotes

For defined migration scopes.

06Full ownership

Your accounts, data, documentation and infrastructure code.

07Time-zone overlap

For cutovers and hypercare across India, the USA, the UK and Canada.

FAQ

Frequently asked questions

Can't find what you need? Ask us directly and our team will get back to you.

A single website or application can often move within a few weeks. Larger estates with many applications and databases are migrated in waves over several months. Discovery gives us the data to provide a realistic timeline.

Most migrations need a short cutover window, which we schedule at low-traffic times. Continuous replication keeps that window as short as possible, and some architectures allow near-zero downtime. We agree the acceptable window with you during planning.

Not necessarily. Rehosting is often the fastest way to exit a data center or meet a deadline. The key is to plan optimization afterward, so you do not carry inefficiencies and higher costs indefinitely.

It can, but it is not automatic. Savings come from rightsizing, paying only for what you use, managed services and commitment discounts. A straight move without optimization can cost more, so we include a cost comparison and post-migration tuning.

Yes. We map equivalent services, replace provider-specific features where needed, migrate data and rebuild infrastructure as code for the target. We plan the sequence to minimize the time you pay for both environments.

Data is encrypted in transit and at rest, access is restricted to named engineers with least-privilege roles and all activity is logged. We also validate data integrity after migration and securely decommission source systems when you are ready.

Yes. We can move them like-for-like to cloud virtual machines or managed database services, or convert them to another engine when that reduces licensing cost. Engine changes need careful schema conversion and testing, which we build into the plan.

Yes. Every migration includes a hypercare period, and we offer ongoing cloud operations, DevOps services and optimization afterward. You can also take over fully with our documentation and handover sessions.

Sometimes. Targeted changes, such as moving to a managed database or containers, often pay off immediately. Larger rewrites are usually better handled as a separate app modernization phase after the move.

Start a conversation

Move to the cloud with a plan you can trust

A successful migration starts with knowing exactly what you are moving. Talk to us about your applications, timelines and target platform, and we will start with a discovery that turns uncertainty into a clear, costed migration plan.

  • ✓A clear plan and a fixed, written quote
  • ✓Weekly demos and one accountable team
  • ✓You own all code, designs and accounts